Skip to content

Spring road ban lifted on Millar Western roads

On Monday, July 22, 2019, Millar Western will lift the Spring Road Ban in effect since April 6th of this year on all roads held or owned by the company. Please be advised that, even with the ban lifted, roads are to be used under DRY or FROZEN conditions only.  Road users are reminded that valid road use agreement(s) must be in place prior to using Millar Western roads.  To verify the status of road use agreement(s), please contact Leah at 780-778-2221 ext. 2163 or millarland@millarwestern.com.

The following will assist in determining what type of agreement you must have in place/or need to request, prior to using the roads:

Short-Term Road Use

Use of MWFP DLO(s) for the purpose of heavy (over 3 Ton), short term use (< 3 months).

Examples include: drilling/service rigs, water/cement/vacuum trucks, Pickers, construction equipment moves, etc.

Long-Term Road Use Use of MWFP DLO(s) for the purposes of ongoing site maintenance throughout the year. Intended for light use (under 3 Ton) (pick up access to sites connected to a pipeline) or heavy use (over 3 Ton) (sites that require regular fluid removal or are not connected to a pipeline), servicing major pipelines or powerlines).
Special Conditions Use of MWFP DLO(s) that does not fall into the above categories.
Emergency access during unfavorable road conditions, access during road ban periods