Skip to content

Spring road ban lifted on Millar Western roads

As of Thursday, August 6, 2020, Millar Western has lifted the Spring Road Ban that has been in effect since April 6th of this year on all roads held or owned by the company.

Please be advised that, even with the ban lifted, roads are to be used under DRY or FROZEN conditions only.  Road users are reminded that valid road-use agreement(s) must be in place prior to using Millar Western roads.  To verify the status of road use agreement(s), please contact Leah at 780-778-2221 ext. 2163 or millarland@millarwestern.com.

The following will assist in determining what type of agreement you must have in place or request, prior to using the roads:

Short-Term Road Use

Use of MWFP DLO(s) for the purpose of light (under 3 ton) or heavy (over 3 ton), short-term use (less than 3 months).

Intended for use such as drilling/service rigs, water/cement/vacuum trucks, pickers, and construction equipment moves.

Long-Term Road Use

Use of MWFP DLO(s) for the purpose of ongoing site maintenance throughout the year.

Intended for light (under 3 ton) use such as pickup access to sites connected to a pipeline, or heavy (over 3 ton) use such as servicing of sites that require regular fluid removal or are not connected to a pipeline, or servicing of major pipelines or power lines.

Special Conditions

Use of MWFP DLO(s) that does not fall into the above categories.

Intended for use such as emergency access during unfavorable road conditions, or access during road ban periods.